Industrial manufacturing

Pig Slaughterhouse Blood Collection Tank

<p>This Pig Slaughterhouse Blood Collection Tank is specified for one practical job: a stainless collection point that receives process liquid and directs it to treatment, storage or further processing. A reliable installation begins with correct interface dimensions and a realistic duty cycle. The HUATAO listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. …

SupplierHUATAO GROUP LTD.www.slaughterpro.com

About this product

Product information from the supplier.

Product Overview

This Pig Slaughterhouse Blood Collection Tank is specified for one practical job: a stainless collection point that receives process liquid and directs it to treatment, storage or further processing. A reliable installation begins with correct interface dimensions and a realistic duty cycle. The HUATAO listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.



Working Principle

Liquid drains into the sloped tank body rather than onto the floor. The outlet arrangement then carries it to the selected pump, vessel or waste line. Adjustable feet help establish the intended fall during installation. The upstream machine must not feed faster than the receiving station can clear.

Main Features

  • Sloped, drainable collection area

  • Wash‑down‑friendly construction

  • Adjustable installation height

  • Outlet position matched to the plant drain

  • Robust frame for daily service

  • Simple access for inspection

Technical Specifications

ParameterReference Value / Buyer Check
ModelHT‑P113
Out size4000×1000×450‑600mm
Depth200‑350mm
Component and material1)‑Stainless square steel 40×40×1.5mm 2)‑ Stainless steel plate 2 mm 3)‑Stainless steel adjusting feet M16×150mm
Quotation controlConfirm tank length, depth, outlet size, drain direction, floor level and whether blood is recovered as a by‑product or sent to effluent treatment.

Application

The usual application is bleeding areas and wet‑process zones where controlled collection, drainage and cleaning access are required. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.

Application Case

Illustrative reference case-A regional pork processor planning for 200 pigs per hour places the pig slaughterhouse blood collection tank between the relevant upstream and downstream stations. Before fabrication, the project team freezes the interface drawing, utility points and operator access. The acceptance check covers dry running, representative‑load operation, emergency stops, cleaning access and a spare‑parts handover. This is a planning example, not a claim about a named customer installation.

Advantages

  • 1. Fits into a defined process stage, which makes line balancing and internal linking easier.

  • 2. Project‑specific dimensions reduce awkward field modifications at installation.

  • 3. Service points and replaceable wear parts can be agreed before shipment.

  • 4. Hygiene and drainage requirements can be reviewed with the equipment layout.

  • 5. Reference source data remains visible instead of being converted into unsupported marketing claims.