A105 Spectacle Blind Flange RF
<div class="text"><p>Type:1.Welding Neck Flange 2.Slip On Flange 3.Blind Flange 4.Plate Flange <br/> 5.Lap Joint Flange 6.Socket Welding Flange 7.Threaded Flange 8.Stamping Flange </p><p> 9.Spectacle Blind Flange<br/>Size:1/2"-72"<br/>Standard :ASME B16.9, ASME B16.25, MSS SP-75, DIN2616, ASME A234,<br/> ASME A403,ASME A402,ASME A860 <br/>Material Carbon steel(ASTM A105. ASTM A350 LF1. LF2, CL1/CL2, A234, S235JRG2,<…
About this product
Product information from the supplier.
Type:1.Welding Neck Flange 2.Slip On Flange 3.Blind Flange 4.Plate Flange
5.Lap Joint Flange 6.Socket Welding Flange 7.Threaded Flange 8.Stamping Flange
9.Spectacle Blind Flange
Size:1/2"-72"
Standard :ASME B16.9, ASME B16.25, MSS SP-75, DIN2616, ASME A234,
ASME A403,ASME A402,ASME A860
Material Carbon steel(ASTM A105. ASTM A350 LF1. LF2, CL1/CL2, A234, S235JRG2,
P245GH,P250GH, P280GHM 16MN, 20MN ,20#)
Stainless steel(ASTM A182, F304/304L, F316/316L)
Alloy steel(ASTM A182 A182 F12,F11,F22,F5,F9,F91etc.)
In the equipment management of the company, full-time management personnel are sent to manage the production equipment and they are in charge of establishing the Production Equipment Ledger, formulating and implementing as scheduled the Annual Maintenance Plan of Equipment, and making registration in the Equipment Maintenance Record. Equipment is maintained and recorded according to the Equipment Failure Maintenance Record.
Production process

Product pictures



Package picture

