Hardware & tools

6 1/2”(165.1mm) IADC537 TRICONE BITS FOR WELL DRILLING

<p><b><span class="15" style="font-family: &quot;微软雅黑 Light&quot;; color: rgb(68, 68, 68); letter-spacing: 0pt; font-size: 10pt; background: rgb(255, 255, 255);"><font face="微软雅黑 Light">Applicability:</font></span></b><b><span class="15" style="font-family: Arial; color: rgb(68, 68, 68); letter-spacing: 0pt; font-size: 10pt; background: rgb(255, 255, 255);">&nbsp;</span></b><span style="font-family: Arial; c…

Source categories

About this product

Product information from the supplier.

                                                                                  Specification

ITEM

DESCRIPTION

Condition

New

Bearing Type

Journal Sealed Bearing/ Rubber O-Ring

Tooth Type

Scoop Inserts-Chisel Inserts-Flat Inserts

Nozzle qty

Nozzle qty

Thread Connection

3 1/2 API REG

IADC

537

Net / Gross weight (kg)

16-18(KG)

Operating parameters

RPM

120-50

WOB

0.45-1.0

Note:The upper limits of WOB and RPM in above table should not be used simultaneously.



Instructions for the use of drill bits

1.Select the appropriate type of drill bit based on formation lithological information, hydraulic and drilling parameters.

2.According to the hydraulic parameters to choose the corresponding nozzle, nozzle hole size grade difference should not be too large, so as not to erode the flow channel.

3.Before the drill bit is lowered into the well, 1) check that the size and type of the drill bit match the well diameter, 2) check that the nozzle is fitted, and 3) check that the specifications of the drill bit connecting wireline mating pattern and the joint match.

4.The drill bit should be lowered in accordance with the prescribed operating procedures for lowering the well, and after the drill bit has made contact with the bottom of the well, please make sure to press gently and turn slowly. After 30 minutes, the drilling pressure can be gradually increased to normal.

  


Cautions

1.The user is requested to select the drill with the appropriate operating parameters in accordance with the operating instructions.

2.Please check carefully the appearance of the drill bit and verify that the end face of the drill bit's fillet is the same as the factory number on the box and the certificate of conformity.

3.Drilling pressure and rotational speed should be within the recommended parameters and should not be used in conjunction with larger values of drilling pressure and rotational speed.

4.The bottom of the well must be clean, and all types of drill bits must not be slipped, slowly lowered, and pier drilling is strictly prohibited.

5.Always operate smoothly during the drilling process. If you find any abnormalities such as jump drilling, you should analyse and take effective measures in time.

6.Drill bits should be stored indoors at 10-30°C, kept dry and ventilated, protected from the sun and rain. The guarantee period is three years.